Existing Facility
![Sponge Iron](img/existing-facility/sponge_iron_1.jpg)
Annual Capacity - 2,70,000 Tons
2 x 350 TPD and 2 x 100 TPD capacity DRI kilns along with Automated Material feeding and Handling System.
![Coal Washery](img/existing-facility/coal_washery.jpg)
Annual capacity - 1 Million Tons
![Steel Melting Shop](img/existing-facility/steel_melting_shop.jpg)
Annual Capacity – 3,45,600 Tons
Steel melting Shop consists of - 8 Induction Furnaces (IF) of 4 x 15 Tons & 4 x 12 Tons each. Having two Casters, One of 10.25/19 meter & another 6/11 Meter two strand Billet Caster.
![Structural Rolling Mill](img/existing-facility/rolling_mill.jpg)
Annual Capacity - 3,63,000 Tons.
Three Structural Rolling Mills - each with a capacity of 500 TPD, 400 TPD and 200 TPD respectively.
![TMT & Wire Rod Automatic Rolling Mill](img/existing-facility/rolling_mill_new.jpg)
Annual Capacity – 1,65,000 Tons
One TMT & Wire Rod Rolling Mill - 500 TPD.
![Captive Power Plant](img/existing-facility/power_plant.jpg)
Capacity - 85 MW
Three Turbo generator Set One of 25 MW and Two of 30 MW capacity with 110 TPH ABFC boiler & 175 TPH CFBC boiler.
![Ferro Alloys](img/existing-facility/ferrow_new.jpg)
Annual Capacity - 28,300 Tons
2 x 9 MVA Ferro Alloys Plant.